Release Date: 23-MAY-2025
GP Versions: 12/14/16/18
MFG PowerPack Build: 15.257
* Actual Cost Rollup – Actual Cost Rollup takes control of the MFG BOM View window to display a complete costed BOM. When BOM View is opened from Actual Cost Rollup it will pull costing from the rollup tables rather than the inventory tables. A new radio button on Actual Cost rollup allows toggling the view between Material Cost Only or Total MFG Cost (which includes the routing costs).